Ball Screw MOQ: How Minimum Orders Work for Buyers

Ball screw MOQ is set per model and per length configuration, not as a single number for the whole catalog. This article uses real SFU product data to show how the figures differ by model, how mixed-length orders are counted, and how buyers can test with samples before committing to a bulk order.

Buyer Guide Β· Order Quantities

A ball screw MOQ is not one figure for the whole catalog. Every SFU model is quoted with its own minimum, and within a model the minimum applies to each length configuration you order. A buyer planning a first order or a small trial run needs to know which SKU they are actually ordering before the number on the quotation makes sense. The sections below use our published SFU product data to show how the figures break down, how mixed lengths are counted, and how sample quantities fit into a small first order.

Key takeaways

  • Minimum order quantity is set per model and per length configuration, not as a single catalog-wide number.
  • SFU1605 and other SFU series configurations carry a minimum of 50 pieces per SKU, where an SKU is a length and diameter combination.
  • SFU2510 and SFU3205 have their own lower minimums, listed separately below.
  • Mixed lengths are accepted, but the minimum applies to each individual SKU, so they are not pooled into one total.
  • Sample quantities of 2–5 pieces are available for qualified buyers on selected models, and sample cost can be credited toward later bulk orders.

Why the MOQ differs from one model to the next

A rolled ball screw is made in diameter and lead combinations, and each combination has its own nut, its own thread-rolling setup and its own length range. When you order a particular diameter at a particular length, the factory is not simply cutting a length off a stock bar. Each configuration carries its own setup, so the minimum order quantity is tied to that configuration rather than to the product family as a whole.

This is why the model matters when you plan a purchase. The same question β€” β€œwhat is your minimum order?” β€” produces different answers depending on whether you are sourcing SFU1605, SFU2510 or SFU3205. The figures below are taken from our published SFU product data, which is the reference you should use when building an order plan.

The per-model MOQ figures

The table below sets out the minimum order quantities for the models covered in this article. Keep each model's figure separate; they are not interchangeable and should not be averaged or combined into a single β€œtypical” minimum.

Model MOQ per length configuration Custom end machining MOQ Sample quantities
SFU1605 (C7 grade) 50 pieces per SKU (length + diameter combination) Confirm against the datasheet Confirm against the datasheet
SFU2510 50 pieces per length configuration 30 pieces per drawing 2–5 pieces, qualified buyers
SFU3205 30 pieces per length configuration 20 pieces per drawing Sample assemblies, qualified buyers

The SFU series as a family β€” for example SFU1605 in C7 grade β€” is quoted at 50 pieces per SKU, where the SKU is the length and diameter combination. The SFU series rolled ball screw assembly page lists the models and lengths in that range.

SFU2510 sits at 50 pieces per length configuration for standard orders, with a custom end machining minimum of 30 pieces per drawing. Full details are on the SFU2510 rolled ball screw assembly with flange nut page.

SFU3205 is lower again: 30 pieces per length configuration, with custom end machining at a minimum of 20 pieces per drawing. This model is also listed with sample assemblies available for qualified buyers. It is described on the SFU3205 heavy-duty rolled ball screw for CNC machining centers page.

What counts as one SKU in a mixed-length order

Mixed lengths are accepted. The important qualification is that the minimum applies per individual SKU, not to the combined order total. If you order two lengths on the same diameter, you are placing two SKU requirements, and each one has to meet its own minimum.

A worked example makes this concrete. Suppose you plan a first order of SFU1605 ball screws in three lengths. Under the 50-piece-per-SKU rule, your order becomes three lines of 50 pieces each. Ordering 150 pieces spread across the three lengths does not reduce any single line below 50. If one of the lengths is a trial used for prototype builds and only needs 10 pieces, that line still sits below the SKU minimum on its own.

The same logic applies to SFU3205 at 30 pieces per length configuration. Ten lengths of 3 pieces each is not a 30-piece order; it is ten separate lines, each one needing to reach the configuration minimum.

This structure is useful to understand when you build the requirement, because it tells you where to consolidate. If several lengths are genuinely needed, plan quantities per SKU so that each line meets the threshold. Where a length is only needed in a handful of pieces, that is usually the point where a sample or a small-batch conversation is the right path rather than a standard production order.

Standard lengths, custom end machining and lead times

Length range affects both what you can order off the shelf and how long it takes to arrive.

  • The standard length range for the SFU series is 300–1500 mm.
  • Standard lengths from 300 mm to 1000 mm typically ship in 7–15 business days.
  • Custom lengths with special end machining typically require 15–25 business days.

If your application sits inside the 300–1000 mm band and needs no special end machining, the shorter lead time applies and you are ordering a standard configuration. Once the length moves outside that band, or the end machining is special to your drawing, the order moves into the custom path with the corresponding lead time.

The custom end machining minimums are separate figures again: 30 pieces per drawing for SFU2510 and 20 pieces per drawing for SFU3205. These are stated per drawing, which means a single machined end pattern. If you are designing a first order around machined ends, treat the drawing as the unit of planning.

Exact end machining options and tolerance requirements should be confirmed against the datasheet for the model and drawing you are ordering.

The sample and small-batch path

For a buyer evaluating a new supplier, the sample route answers the question a quotation cannot: whether the physical part suits the assembly. On selected models, sample quantities of 2–5 pieces are available for qualified buyers. SFU2510 is listed with this range, and SFU3205 is listed with sample assemblies available for qualified buyers.

Two things are worth checking with your sales contact before you plan the sample order.

  • Whether the specific length and configuration you need falls inside the sample allowance, because it is offered on selected models rather than every configuration.
  • Whether your quantities qualify for the sample path, since it is described for qualified buyers.

Budgeting also benefits from knowing that sample cost can be credited toward a later bulk order. The published thresholds are:

  • SFU3205: for bulk orders of 50+ pieces, sample cost is fully credited.
  • SFU2510: sample cost is credited toward bulk orders of 100+ pieces.

The practical effect is that a sample order is not a dead cost if it converts. It becomes part of the bulk order that follows, provided the later order meets the threshold for that model. If you are testing more than one configuration, those thresholds are worth noting down before the sample order is placed, because they tell you what a conversion order needs to look like for the credit to apply.

A sensible sequence for a first order

  • Define your requirement as diameter, length and end machining, and check the length against the 300–1500 mm range.
  • Identify which model your design calls for, since the MOQ figure is tied to the model.
  • If the quantity per configuration is below the model minimum, ask about the sample allowance for that specific configuration before assuming a production order is the only option.
  • Build the bulk requirement so each SKU meets its own threshold, not just the combined total.
  • Check whether the bulk quantity reaches the credit threshold for the model whose sample you tested.

Questions buyers ask before a first order

Is there one MOQ for all ball screws?

No. The figure is set per model and per length configuration. SFU series configurations such as SFU1605 in C7 grade are listed at 50 pieces per SKU, SFU2510 at 50 pieces per length configuration, and SFU3205 at 30 pieces per length configuration. Always read the figure against the specific model you are ordering.

Can I mix lengths to reach the minimum?

Yes, mixed lengths are accepted, but the minimum applies per individual SKU. The quantities are not pooled across lengths, so each configuration you order needs to meet its own threshold.

What if I only need a handful of pieces to test?

That is the sample path. Sample quantities of 2–5 pieces are available for qualified buyers on selected models, and sample cost can be credited toward a later bulk order subject to the model's threshold.

How long will my order take?

Standard lengths from 300 mm to 1000 mm typically ship in 7–15 business days. Custom lengths with special end machining typically require 15–25 business days.

If you are ready to size a first order, review the SFU series rolled ball screw assembly range, then confirm the configuration and quantity you need against the datasheet for your model before placing the order.