Stock sizes ship in 7–15 business days; H5 grade, large bores and custom machining stretch it. What to confirm before ordering linear bearings.
Linear Bearing Lead Time: What Actually Drives It
When you order linear bearings, the delivery date you get depends on four things: whether the size you need is in stock, whether you specify a precision grade, the minimum order quantity (MOQ) structure, and how the goods travel. This guide explains each driver with concrete ranges from a supplier’s published terms, so you can plan around them rather than be surprised by them. Ranges marked in business days are working-day figures; ranges stated in plain days should be confirmed as business or calendar days when you request your quotation.
This article covers LM and LMK bushings and flanged units. For ball screws, a separate guide applies. Guideway rails follow their own stock rules, briefly noted later.
Key takeaways
- Common LM sizes (LM6–LM30) and LMK sizes (LMK6–LMK25) are stocked and ship in 7–15 business days (LMK: 7–10).
- Larger or less common sizes (LM40–LM60, LMK30–LMK50) typically take 20–30 days or 15–20 days, respectively.
- H5 precision grade is available on request for LM8–LM40 and LMK8–LMK40; price and lead time differ and must be inquired.
- MOQ is 100 pcs per shaft diameter and type (LM) or per size (LMK). Sample quantities of 10–20 pcs are possible for qualified buyers.
- Express courier (DHL/FedEx) takes 5–7 days for samples; sea freight to Europe is 25–35 days, to USA 18–25 days.
On this page
1. Stock coverage of common sizes
Inventory decides the starting point. For LM-series linear ball bearing bushes, the most common shaft diameters — LM6 through LM30 — are kept in stock and typically ship within 7–15 business days. For LMK-series double-length flanged units, in-stock sizes LMK6–LMK25 ship even faster, in 7–10 business days.
If your design calls for larger or less common sizes, the bearing may need to be produced or pulled from a slower-moving stock. LM40–LM60 typically take 20–30 days; LMK30–LMK50 take 15–20 days. These ranges assume the item is not otherwise constrained by the other drivers below.
Before you commit, confirm which specific sizes are currently on the shelf. Stock levels change, and a size that was in stock last quarter may now be back-ordered.
2. Precision grade options (H5)
Standard linear bearings are manufactured to a general tolerance. If your application requires H5 precision grade, it is available on request for LM8–LM40 and LMK8–LMK40. H5 affects both price and lead time, and the exact delivery window must be inquired at the time of order.
Why does grade stretch lead time? Precision bearings often require additional machining, tighter inspection, and sometimes a dedicated production run rather than picking from standard stock. The supplier will confirm the schedule based on the quantity and the specific size you need.
3. MOQ structure
MOQ affects how quickly an order can be processed and whether it goes through standard stock picking or a production queue. For LM series, the standard MOQ is 100 pcs per shaft diameter and type. For LMK series, it is 100 pcs per size.
If you need only a few pieces for testing or a small repair, sample quantities of 10–20 pcs are available for qualified buyers. Sample orders are typically handled faster because they draw from stock and move through express courier. However, they still require the supplier to confirm availability and qualification terms.
When your order exceeds the MOQ or mixes multiple sizes, the lead time may be governed by the slowest item. Confirm the delivery estimate for each line item, not just the total order.
4. Freight mode
Production or stock-picking time is only part of the total lead time. Transit adds days depending on the mode you choose.
- Express courier (DHL/FedEx): 5–7 days for samples. Suitable for urgent needs and small quantities.
- Sea freight to Europe: 25–35 days.
- Sea freight to USA: 18–25 days.
These ranges are typical transit times and do not include customs clearance or inland delivery. For production orders, sea freight is the common choice, but it adds weeks to the total. If you need bearings quickly, express courier is faster but limited to smaller shipments.
Packaging also plays a role in freight planning: bearings are individually oiled in plastic bags, packed in partitioned cartons, and bulk export orders are placed on wooden pallets. This protects the bearings but may affect how they can be consolidated with other goods.
A note on guideway rails
Guideway rails are a separate product family with their own stock rules. For example, common in-stock rail sizes such as HGR20, HGR25, and HGR30 typically ship in 7–10 business days. If your project combines bearings and rails, confirm the lead time for each component separately.
Summary: how to get a reliable delivery date
Linear bearing lead time is not a single number. It is the result of stock coverage, precision requirements, MOQ, and freight mode. Common sizes ship in 7–15 business days; larger sizes take longer; H5 grade and custom machining require inquiry; and freight can add anywhere from a few days to several weeks.
When you request a quote, specify the exact model, size, quantity, and precision grade, and ask the supplier to confirm which items are in stock and what the total lead time will be including transit. That way you can align your procurement schedule with the real drivers.